Deane's Children's Park · Mercer Island

Every kid on this island should be able to reach the dragon.

Plenty of them can't. The paths through Dragon Park have broken down into gravel, dirt, and roots. The City has adopted a plan to rebuild it for every age and ability. We're raising the money to get it built sooner.Plenty of them can't. The paths through Dragon Park have broken down into gravel, dirt, and roots. The City has adopted a plan to fix that. We're raising the money to build it sooner.

The full cost of building the adopted plan
$5M
The full cost of building the adopted planTo build the whole plan
Secured or on track
$2M
Secured or on track, from the Parks Levy and a state grantSecured or on track
Still to raise
$3M
Still to raise. This is the part neighbors decideStill to raise
Neighbors in the group
218
Neighbors already in the Friends of Dragon Park groupNeighbors in the group

What's in the way

The ground has given out

The park is 64 years old. These aren't inconveniences. They're the reason some children on this island have never made it to the dragon.The park is 64 years old. These aren't inconveniences. They're the reason some children here have never made it to the dragon.

Paths that end in gravel

Asphalt laid decades ago has broken down into loose gravel, dirt, and bark chips. A wheelchair stops. A walker stops. A stroller stops.A wheelchair stops. A walker stops. A stroller stops.

Roots and rotting timber

Crumbling timber edging and surfaced tree roots turn most of the site into a trip hazard, and an impassable one on wheels.Most of the site is a trip hazard, and impassable on wheels.

Play only some kids can use

Equipment installed between 2005 and 2012 was never designed for children with mobility, sensory, or learning differences.Equipment from 2005 to 2012, built for a narrower idea of who plays.

What's changing

A path to the dragon, and the woods left standing

The City Council adopted this plan on April 7, 2026, six votes to one. It was shaped by two community surveys, an open house, and more than 1,200 elementary students.The City Council adopted this plan on April 7, 2026, six votes to one. More than 1,200 elementary students helped shape it.

The Forest Path

One firm, stable, step-free route connecting every play area, the shelter, the restrooms, and the dragon. This is the spine of the whole plan, and the first thing private money can buy.One firm, step-free route connecting every play area, the shelter, the restrooms, and the dragon.

400 ft
End to end
0 steps
No curb, no stairNo curb
2
Benches to restBenches

Play for every body

Adaptive swings, ground-level climbing, and transfer points so a child can leave a wheelchair and get in.Adaptive swings, ground-level climbing, and transfer points.

Quiet corners

Sensory play and tucked-away spaces for kids who need less noise, not more of it.

The woods stay

The route is designed around the trees that are already there. Nobody is clearing the forest to pour a path.Designed around the trees already there. Nobody is clearing the forest.

The dragon stays

Repaired and restored right where he sits. As our founder puts it, he needs a dentist and a pedicure.Repaired and restored right where he sits. He needs a dentist and a pedicure.

From the adopted plan

Critter Corner, for ages 2 to 5. Ground-level play a toddler and a parent using a wheelchair can both reach.Critter Corner, for ages 2 to 5.
The Central Play Zone. The green surface is the accessible route, running right through the middle of the play.
The 5-12+ tower, the landmark for older kids, built as a standing tree snag.The 5-12+ tower, built as a standing tree snag.
The adopted site plan. Kenton's Dragon stays where he is, top centre, with the Forest Path threading past him to every zone.The adopted site plan. The dragon stays, top centre.

Renderings and site plan from the Deane's Children's Park Site Plan Report, adopted by Mercer Island City Council as Resolution No. 1692 on April 7, 2026. Prepared for the City by Berger Partnership.Renderings and plan from the Site Plan Report adopted as Resolution No. 1692, April 7, 2026. Prepared for the City by Berger Partnership.

See the full site plan (opens in a new tab)

The dragon

He has already been rebuilt once

Kenton Pies built the first one in 1965. Plaster and steel, fifty feet long, six tons. By 2013 the paint would not hold any longer, and Parks staff tracked him down in Montana to ask about repairs.

He was 81. He offered to build a new one instead. He did, in four pieces, and had them trucked across the state.

Ask anyone here whether a thing worth keeping is worth rebuilding.

The head of the 1965 dragon, kept in the bushes when the new one went in.
Kenton's Dragon today. Forty-five feet, scales and all, waiting on a dentist.
The way in today. Gravel and roots, and the dragon somewhere past it.
1962
The Preschool Association builds the park with volunteer labor and donated materials.
1965
Kenton Pies sculpts the first dragon. Fifty feet, six tons of plaster and steel.
2013
At 81, he builds the replacement standing today. Forty-five feet, and better than the first.
2026
The City adopts a plan to rebuild everything around him, so everyone can get there.

Who we are

Six organizations, one park

Friends of Dragon Park is a coalition of island groups working alongside the City. We don't own the park and we don't run the project. We raise support for it.

Rotary Club of Mercer Island

Set up the first account for earmarked gifts and hosted the June event at The Rock.

Mercer Island Preschool Association

Built the original park in 1962. Still here, still raising money for it.

Moms for Safe Mercer Island

Parent advocacy for safe, well-kept places for island children to play.

Friendship Circle

The lived experience of families raising children with special needs.

Outdoors for All

Adaptive recreation expertise. They tell us what accessible play actually requires.

Special Services and Learning Disabilities

Keeps the plan honest about the full range of learning and sensory needs.

The community

This all started in a Facebook group

218 neighbors are already in it. It is where news lands first, where the events get organised, and where you can ask the co-chairs a question and get a real answer.218 neighbors are already in it. It is where news lands first and where the events get organised.

Join the group

Public group. Anyone on the island can join, and anyone anywhere can read it. No cost, no commitment, and it is the fastest way to know what is happening next.Public group. Free to join, and the fastest way to know what happens next.

Pinned

People ask me what will happen to the iconic Dragon at Deane's Children's Park when the city renovates this great park and playground. It will be repaired and restored, but isn't going anywhere. It needs a dentist and a pedicure!

Where the money is

Two million in. Three million to go.

The whole plan costs about $5 million and gets built in phases over several years. The City has $2 million secured or on track. The rest decides how many phases happen, and how soon.

$5 million to build the whole plan $3 million still to raise

The whole plan costs about $5 million and gets built in phases. The City has $2 million secured or on track. The last bar is the one you can change.

$1.5M committed
City of Mercer Island, from the 2022 Parks Levy.
$500K applied for
State Recreation and Conservation Office grant. Decision pending.
$3M from all of us
Grants, foundations, businesses, and neighbors. Every phase waits on this.

How to give

Give directly to the City

Donate through Mercer Island Parks and Recreation and write Dragon Park in the designation field. Name the park, or the gift goes to the general fund.

Give to Dragon Park (opens in a new tab)

What changed

Rotary has handed off collections

The Rotary Foundation set up the first account and carried it as far as an all-volunteer treasurer could. We're grateful, and gifts now go straight to the City instead.

Other ways

Show up, or say something

Come to a coalition event, wear the T-shirt, write the Council, or tell one neighbor what this park is going to become. All of it counts.

Straight answers

What people actually ask us

Is the dragon being removed?
No. He stays exactly where he is and gets repaired and restored. Nothing in the adopted plan moves or replaces him.
Are you paving the forest?
No. The route runs through the woods and is designed around the trees already standing. Preserving the wooded character was one of the top things residents asked for, and it is written into the plan.
When will it be built?
In phases, over several years. The plan is a long-range roadmap, not a single construction season. Phase one waits on grant decisions and private giving.
Who actually receives my money?
The City of Mercer Island. Give through the Parks and Recreation website and designate Dragon Park. Friends of Dragon Park does not hold your gift.
Is my gift tax-deductible?
Gifts designated to Dragon Park go to the City, a public agency. How that applies to your return depends on your situation, so check with your tax advisor. We can't give tax advice.
What happened to the money already raised?
About $15,000 is sitting in an earmarked account, untouched. It transfers to the City as soon as the Parks team is ready to take outside donations for this project.

Sixty-four years ago, your neighbors built this park by hand.

Finishing the path to the dragon is the same job, one generation later.

Give to Dragon Park

Through the City of Mercer Island. Remember to designate Dragon Park.

Help finish the path Designate Dragon Park
Give